010203
0102
50 +
Production Capacity (Ton)
2000 +
Existing Moulds (Sets)
999 +
Project Matching
500 +
Cooperating Companies
010203040506070809101112
0102
Spanish apron with high-strength FRP deck boards
The apron, situated atop the Tres Cruces Hospital in Bilbao, Spain, spans 3 meters and can accommodate helicopters weighing up to 6 tons (13,200 lbs).
01
Rama 8 Bridge in Thailand using FRP pultruded profiles
The Rama 8 Bridge, situated over the Chao Phraya River in Bangkok, the capital of Thailand, was completed in 2001 and has since been operational.
01
Old port project using pultruded FRP profiles on top of cooling towers
The FRP cooling tower utilized in the Shanghai Laogang Renewable Energy Utilization Center Phase II Project was designed by SPX Company.
01
March,13 2024 The dragon issued a running group collection order: run willow horse to enjoy the bauhinia folk custom
As the gold sponsor and guarantor of this event, Dongfeng Liuqi issued a sincere invitation to the majority of card friends: Join the Dragon running group, and feel the beauty and happiness of running in the Bauhinia Sea. Chenglong also hopes to pass on the concept of health sports to the majority of card friends through this activity, so that more card friends can join the ranks of the movement...
Spanish apron with high-strength FRP deck boards
The apron, situated atop the Tres Cruces Hospital in Bilbao, Spain, spans 3 meters and can accommodate helicopters weighing up to 6 tons (13,200 lbs).
Rama 8 Bridge in Thailand using FRP pultruded profiles
The Rama 8 Bridge, situated over the Chao Phraya River in Bangkok, the capital of Thailand, was completed in 2001 and has since been operational.
Old port project using pultruded FRP profiles on top of cooling towers
The FRP cooling tower utilized in the Shanghai Laogang Renewable Energy Utilization Center Phase II Project was designed by SPX Company.


Learn More


